Coventry Overheating Assessments (Part O – Building Regulations)
Fully compliant Part O overheating assessments for new residential developments in Coventry
ICMI Associates provides fast, accurate Part O Overheating Assessments to ensure your new build project in Coventry meets the latest Building Regulations. Whether you’re a developer, architect, or self‑builder, we help you demonstrate compliance with Part O by assessing solar gains, ventilation, shading, and internal temperature risk.
Our assessments follow the approved Simplified Method or TM59 Dynamic Thermal Modelling, depending on your project’s complexity.
⭐ Why Part O Matters
Since June 2022, Part O of the Building Regulations has been mandatory for all new residential buildings in England. It ensures homes are designed to avoid excessive heat during summer months — a growing issue due to airtight construction, large glazing areas, and climate change.
A Part O Overheating Assessment is required for your project in Coventry:
- New build houses
- New build flats
- Residential conversions (where applicable)
- Student accommodation
- Care homes and assisted living units
Without a compliant overheating report, Building Control cannot sign off the dwelling.
What Our Overheating Assessment Includes
We assess your design using one of the two approved compliance routes:
1. Simplified Method (Part O)
Ideal for straightforward designs. We check:
- Maximum glazing limits
- Orientation‑based solar gain allowances
- Shading requirements
- Ventilation openings and free area calculations
- Cross‑ventilation feasibility
2. TM59 Dynamic Thermal Modelling
Required for more complex or high‑risk dwellings. We simulate:
- Hour‑by‑hour internal temperatures
- Solar gains and shading performance
- Ventilation effectiveness
- Night‑time cooling
- Occupant comfort thresholds
TM59 modelling is essential for:
- Houses with large glazing areas
- Complex architectural designs
- Flats and Student Accommodation
- Single‑aspect apartments
- High‑risk locations (London, urban areas)
📄 What You Receive
- A fully compliant Part O Overheating Report
- Clear pass/fail results
- Practical mitigation options if improvements are needed
- Fast turnaround and direct communication
-
Reports accepted by Building Control nationwide
📥 What We Need From You
- To begin your assessment, simply send:
- Floor plans, elevations, and sections
- Window and door schedule
- Ventilation strategy (trickle vents, MEV, MVHR, etc.)
- Shading details (overhangs, balconies, external shading)
- Site address and postcode
If you’re unsure about any of these, we’ll guide you through it.
How Part O Fits With SAP & EPC
Many projects require all three assessments:
| Assessment | Regulation | Purpose |
|---|---|---|
| SAP Calculation | Part L | Energy efficiency & carbon compliance |
| EPC Certificate | EPC Regulations | Energy rating for sale/let |
| Overheating Assessment | Part O | Summer comfort & thermal safety |
Part O is not an energy assessment — it focuses solely on overheating risk.
📣 Call to Action
Request Your Part O Overheating Assessment in Coventry
Send us your drawings and project details for a fast, fixed‑fee quote. We’ll ensure your design meets Part O and passes Building Control with confidence.